Introduction
27
Overview of the base unit
To provide exibility in line with customer requirements,
two versions of the base unit are available.
n The ACCU-CHEK Inform II Base Unit
n The ACCU-CHEK Inform II Base Unit Light
Both versions of the base unit can:
n charge the meter battery pack.
The ACCU-CHEK Inform II Base Unit supports:
n communication with a data management system.
n communication with a computer.
Both versions of the base unit have the following
elements:
14 Charging contacts
15 Infrared window for communication with the meter
16 Status LED (lights up when power is connected):
Lights up red: Power supply is connected,
application is starting up (ACCU-CHEK Inform II
Base Unit only)
Lights up green: Ready
Flashes red: Error
Lights up blue: Conguration mode (ACCU-CHEK
Inform II Base Unit only)
17 Jack for the power supply unit provided
18 Removable mount for wall installation
The ACCU-CHEK Inform II Base Unit has the following
additional elements:
19 Network connection — LAN, Ethernet (RJ45)