
Powering Up and Entering an Operator ID
31
2 Powering Up and Entering an Operator ID
Powering up the meter
1 Press and release the On/Off button . The meter
is now on.
2 The Power Up screen appears.
3 Check in the Power Up screen whether the date
(lower left) and time (upper right) are displayed
correctly. If necessary, refer to the instructions for
updating these settings in Chapter 9.
3HUIRUPLQJVHOIFKHFNV
n If during self-check an error is detected, the
appropriate error message appears on-screen.
n If the QC Lockout feature is enabled and glucose
control is required, a corresponding message is
displayed.
n The battery icon shows the current battery level.
A completely lled icon
indicates a fully
charged battery, and a partial charge is displayed
as a partially lled battery icon
.
Comentários a estes Manuais